Focuse on"project safety,water supply safety,water quality safety"and strengthen integrated regulation to promote the high-quality development of the Middle Route of the South-to-North Water Diversion Project
Liu Dongshun
Abstract:Achievements of the Yangtze River Water Resources Commission of MWR in safeguarding project safety,water supply safety and water quality safety since the operation of phase-I of the Middle Route are reviewed,especially in the respects of enhancement of operational management level,implementation of precise and accurate scheduling,protection of water sources and integrated regulation of the whole basin.However operation and management of the phase-I scheme are still facing new challenges,including increasing difficulty of coordination for multi-purpose utilization,establishment of supporting system for the protection of the Danjiangkou Reservoir,enhancement of risk prevention and control capabilities,and comprehensive management and technological support for the Danjiangkou Reservoir area and upstream.Measures are proposed to promote high-quality development,such as advancing high-quality development of the follow-up projects,ensuring safe operation and precise scheduling for water supply,protection of the Danjiangkou Reservoir and its upstream,and building up capacity of governance and management.
Keywords:the South-to-North Water Diversion Projectproject safetywater supply safety and water quality safetyintegrated regulation and schedulingnational water networksdigital twinhigh-quality development
Publication Date:2024-10-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 10-14 )
China Water Resources

China Water Resources

ISSN:1000-1123
Year, Vol.(Issue):2024,(20)