Research on the Joint Dispatching Strategy and Mechanism of Controlled Water Engineering in the Dongjiang River Basin
Song Lixiang
Liu Yu
He Yong
Yang Fang
Abstract:Drought and flood events coexist in the Dongjiang River Basin,and the situation of flood control and water supply security in the basin is severe.The Xinfengjiang Reservoir,Fengshuba Reservoir,Baipenzhu Reservoir,and main stream cascade hydropower stations are important water conservancy projects in flood and drought prevention in the basin.Summarize the research and practical status of the joint scheduling of water engineering in the Dongjiang River Basin in terms of management system,flood control scheduling,and water volume scheduling.Collect experience,cases,and data on the operation of water conservancy projects in the watershed,and analyze the existing problems in the current scheduling system and mechanism and propose suggestions and countermeasures.
Keywords:Dongjiang River Basinflood and drought disaster preventionlarge reservoircascade hydropowerjoint dispatchinstitutional mechanisms
Publication Date:2024-02-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:8( 34-41 )
