Thinking on some key issues of flood control planning of the Pearl River Basin under new circumstances
He Yong
Li Xudong
Zhang Yin
Abstract:The basic problems in optimizing the layout of flood control engineering system,arranging flood outlet and improving the flood control capacity of river basin are the understanding of the change of hydrological regime,the identification of flood risk and the coordination of flood control standards in the changing environment.According to the new situation of flood control in the Pearl River Basin,the present situation and shortcomings of related methods of design flood prediction and flood risk assessment are analyzed.Based on the hydrological dynamic model and the changing environment of the designed rainfall,the design flood prediction method is preliminarily discussed,and the refined flood risk identification method considering the flood channel is proposed,and how to coordinate the upstream and downstream of the river basin and achieve the coordinated improvement of flood control standards is preliminarily elaborated,in order to provide reference for the flood control planning of the Pearl River Basin under the new situation.
Keywords:design floodflood riskstandard collaborationthe Pearl River Basin
Publication Date:2024-01-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 46-51 )
China Water Resources

China Water Resources

ISSN:1000-1123
Year, Vol.(Issue):2024,(2)