Control of over-excavation and under-excavation in tunnel excavation by drilling and blasting method——take the Jiaohua Reservoir in Hunan Province as an example
Yu Jianghua
Gong Shuhui
Xu Shulong
Peng Jiazhong
Machine-generated Keywords:
Publication Date:2023-01-12
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 65-68 )
China Water Resources

China Water Resources

PKU
ISSN:1000-1123
Year, Vol.(Issue):2023,(1)