Quality determination of pre-stressed anchorage with long bolt exposed to rock wall crane beam for Baihetan Hydropower Station construction
Chen Shixiao
Zhang Xia
Bao Hang
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 60-62 )
