Research on Integrated Construction Technology of Lighting Equipment in Prefabricated Building Prefabricated Components
LI Qingli
XU Dongdong
LI Rui
Abstract:In the process of industrialization of prefabricated buildings,the integrated construction of lighting equipment and prefabricated components faces the core challenges of low pre-embedded accuracy,structural damage and high operation and maintenance costs.In view of the above problems,this paper innovatively puts forward the technical system of'modular design-precision control-cooperative construction',and realizes the leap of engineering efficiency through three major technical breakthroughs:First,the research and development of spliced junction box module and flexible composite line pipe with compressive strength≥15 MPa solves the problem of pipeline and steel truss conflict,and the qualified rate of laying is increased to 98%.Secondly,a magnetic suction positioning tooling and a real-time monitoring system were designed to compress the average embedded deviation from 5.2mm to 1.8mm,and the qualified rate was increased from 68%to 95%.Thirdly,the whole chain coordination process of'design-production-assembly'is constructed,the construction time of single component is shortened by 73%,and the comprehensive cost is reduced by 22%.The empirical research shows that the system significantly improves the operation and maintenance efficiency,reduces the time of lamp replacement by 70%,the user's light environment satisfaction score reaches 92 points,and the complaint rate decreases by 65%.
Keywords:prefabricated buildinglighting equipmentintegrated constructionembedded precisionmodular design
Publication Date:2025-09-25
Online Publishing Date:2025-10-14(First online date of this platform, not the publication date of the document)
Pages:5( 71-75 )
