Discussion on the Optimization and Quality Control of Subway Power Lighting Cable Laying Process
YAN Xiaopeng
LIU Qi
SONG Xianglin
ZHAO Liang
Abstract:In this paper,the problems of insufficient laying accuracy,insufficient cable fixing and protection,cable joint and connection quality,and insufficient environmental adaptability design are systematically analyzed in the subway power lighting cable laying process.These problems are expected to be addressed through the adoption of high-precision cable laying technology,improved cable fixing and protection measures,standardized cable gland treatment processes,and the introduction of environmentally friendly design.The introduction of quality control solutions can further ensure the reliability and safety of the cable system.
Keywords:subway cable layingquality controllaying precisioncable fixation
Publication Date:2025-03-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 72-74 )
China Light & Lighting

China Light & Lighting

ISSN:1002-6150
Year, Vol.(Issue):2025,(3)