The Measure and Proposition of Avoiding the Risk of the Hospital's Basi-construction Engineering at the Lowest Price Under the Standard Methord and Standard mode
Yao Yue
Ba Zhiqiang
Yu Runji
Machine-generated Keywords:
Publication Date:2006-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:2( 79-80 )
