Response characteristics analysis of mine water filled structure with ground-tunnel transient electromagnetic method
LI Kai
SUN Huaifeng
Machine-generated Keywords:
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:10( 1113-1122 )
