Frozen soil project question and counter-measure in the Qinghai-Tibet railway construction马辉, 刘建坤, 张弥, 郭大华4-9
Project construction technology of flood-prevention work done on rivers in the plateauGou Tiansheng, Tong Yongping10-12
Qinghai-Tibet railway Yangbajing tunnel seepage ink control the scheme and constructZhao Xvman21-23,37
Introduction to the medium- sized structural thing winter construction of the project of the railwayWang Shengtao26-27,40
The plateau tunnel accumulates the stratum construction technology through the aeolian accumulation,sandJin Bangyuan28-31