Study on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L
Gou Jianpeng
Fu Ke
Abstract:Based on the background of the research on the reinforcement design of energy dissipation facilities at the back of a fixed bed dam in River L to ensure the stable water supply of the city,on the basis of the analysis of en-gineering geology,construction diversion and other factors,the optimal design scheme is proposed through hydraulic calculation and the analysis,and finally good results are achieved.It can not only serve as a reference for the rein-forcement design of energy dissipation facilities for the same type of fixed bed dam,but also provide reference for the daily technical management of the engineering management department.
Keywords:Water deliverySolid bed damEnergy dissipationReinforceDesignStudy
Publication Date:2024-08-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 67-71 )
Tibet's Science & Technology

Tibet's Science & Technology

ISSN:1004-3403
Year, Vol.(Issue):2024,46(8)