Construction and internal environment study of the foamed ceramic prefabricated light structure phase change room
PENG Luowen
CI Enda
CHEN Weiwei
LEI Qiang
AI Mingxing
LI Xiaoqing
WANG Hui
LI Jianqiang
Machine-generated Keywords:
Publication Date:2021-07-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 1-5 )
