Analysis and construction treatment of quality defects of uncompleted building before reconstruction
CAO Wenhui
CHEN Zhibo
CHONG Daotan
Abstract:The construction of a large commercial frame-shear wall high-rise building has been interrupted for seven years. Some engineering quality defects need to be treated in order to meet the requirements of reconstruction. Some common defects of un-completed buildings are analyzed and treatment measures such as carbon fibre reinforcement construction,bar planting and grouting are discussed for reference of engineering quality inspection and identification personnel and reinforcement construction personnel.
Keywords:uncompleted buildingreconstructionquality defectsconstruction treatment