Study on design of the surface grouting system for underground backfilling with refuse from coal preparation plant
LIU Lijun
SONG Tianqi
GUO Zhan
Machine-generated Keywords:
Publication Date:2023-04-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 77-80 )
