Genetic algorithms for optimizing of multiple resource scheduling problem
ZHANG Ying
Wang Dingwei
Wang Fuli
Abstract:Multiple Resource Constrained Project Scheduling Problem (MRCPSP) has been research. The objective is to determine the starting time for the activities of a project satisfying precedence and resource constraints in order to level resource usage. Nonlinear integer programming model has been established, genetic algorithm for solving leveling multi-types resource usage problem in MRCPSP is presented. Numerical examples show that genetic algorithms perform well for MRCPSP.
Keywords:genetic algorithmslevel resource usagenonlinear integer programming