Denitration System Retrofit for Six-stage Preheater
FEI Xueying
RAO Rui
ZHANG Lihua
LI Jiale
WANG Yuehong
Abstract:After the five-stage preheater of our company's 5 000t/d cement clinker production line was upgraded to a six-stage preheater,the SNCR denitration system encountered problems such as low denitration efficiency,increased nitrogen oxide emission concentration,and excessive ammonia water consumption,resulting in a significant increase in operating costs.To meet the emission concentration limit requirements and reduce operating costs,measures such as detection at each node,re-arrangement of spray guns,and trial-and-error elimination were taken.Through debugging and comparison of the SNCR denitration system,the set goals of reducing nitrogen oxide emission concentration,significantly reducing ammonia water consumption,and lowering operating costs were achieved.
Keywords:SNCR denitration systempreheaterammonia water spray gundenitrification efficiencyoperating cost
Publication Date:2025-11-25
Online Publishing Date:2025-12-02(First online date of this platform, not the publication date of the document)
Pages:5( 74-78 )