Upgrading and Transformation Practice of Energy-saving and Carbon Reduction for 5000t/d Cement Clinker Production Line
GAO Weimin
MA Jiaomei
ZHANG Wei
SUI Mingjie
YU Weimin
Abstract:A certain 5 000t/d cement clinker production line with problems such as poor heat exchange efficiency of preheater,high outlet temperature of C1 cyclone outlet,small calciner volume,high NOx emission,low heat recovery efficiency of cooler,and high energy consumption per unit product of clinker.It is a pilot project for carbon peak and carbon reduction technology transformation in the cement industry.The project applies an energy-saving and carbon reducing upgrade plan for the pyro system,and simultaneously optimizes and upgrades the raw material grinding system and cement grinding system.By adopting technological transformation measures such as expanding the volume of calciner,applying low-energy self-denitrification technology,upgrading the 5-stage preheater to 6-stage,expanding the kiln chamber,replacing the tertiary air duct,and apply a grate cooler with intermediate roller crusher and high-efficiency fans.The fuel consumption per unit product of clinker is lower than the national standard level 1 energy efficiency index,saving 3.5×104t of standard coal per year,reducing CO2 emissions by 7.7×104t,saving 0.3×104t of ammonia water consumption,and NOX emission concentration<50mg/Nm3,with significant energy-saving and carbon reduction effects.
Keywords:pyro systemenergy efficiency improvementupgrading the 5-stage preheater to 6-stageself-denitrification technologyenergy conservation and carbon reduction
Publication Date:2024-09-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 19-25 )
Cement Technology

Cement Technology

ISSN:1001-6171
Year, Vol.(Issue):2024,(5)