Reasons Analysis and Improvement Measures of Slag and Iron Continuous Discharge Incomplete in Blast FurnaceLU Baojun1-3
Practice of Raising Yield under the Deterioration of Coke Quality of Laiwu Steel 1880 m3 BFGONG Wenlei4-5,8
Practice of Recovery of Blast Furnace Conditions after Unplanned Stopping Coal Injection of No.11880 m3 BF in Laiwu SteelZHU Mingqi6-8
Production and Practice of Ultra-thin Cold Rolled Low Carbon Steel Strip in Taishan SteelWANG Yongsheng, ZHAI Naibo, ZHANG Weiguo, HE Min9-12
Optimization and Practice of Production Process of Nb-microalloyed BilletWANG Jian, REN Keshe, GUO Da13-15,18
Development of Grade 800 MPa Hot Rolled Steel Strip for Automobile BeamGUAN Chuanhua, TANG Xiaoyong, ZUO Peng, CHEN Hongyu16-18
Analysis on the Causes of Nonconformity in Ultrasonic Flaw Detection of Steel Plate for Excavator BoomLI Xuedong19-20
Application of Underground Curtain Grouting Near Ore Body in Metal Mines with Rich Water in High PlateauYI Weigong, XIN Xiaomao21-23