Summary of the Practice of Shutting down the No.3 Blast Furnace in the Ironmaking Plant of Shiheng Special Steel Company
CHANG Zhongliang
TANG Gang
WANG Liyong
CHEN Hongjiao
Abstract:This paper summarizes the process of blowing out,blowing in,and rapid production recovery after restarting the No.3 blast furnace at the ironmaking plant of Shiheng Special Steel.Key operational techniques,parameter controls,and management measures during the blow-out and blow-in phases are elaborated.Practical experiences in blow-out preparation and operations,furnace lining spraying,selection of blow-in parameters,and operational rhythm control are highlighted.Optimization directions are also discussed.
Keywords:blast furnaceblow-out operationblow-in parametersitemized repair
Publication Date:2025-06-20
Online Publishing Date:2026-05-22(First online date of this platform, not the publication date of the document)
Pages:4( 7-10 )