Design Scheme of Power Generation System by the Waste Gas Heat from 180 m2 Sinter Ring Cold Machine in Taishan Steel
Machine-generated Keywords:
Publication Date:2010-01-01
Online Publishing Date:2026-05-22(First online date of this platform, not the publication date of the document)
Pages:3( 19-20,26 )
SHANDONG METALLURGY

SHANDONG METALLURGY

ISSN:1004-4620
Year, Vol.(Issue):2010,32(3)