Study on stress state of immediate roof above backfill area in gob-side entry retaining and its application
ZHANG Zizheng
BAI Jianbiao
WANG Weijun
CHEN Yong
YU Xianyang
Abstract:In order to overcome the problems with the immediate roof control of gob-side entry retaining (GER) in a fully-mechanized top-coal caving longwall,a compound roof longwall and other soft cracked longwall,an elastic damage mechanics model of immediate roof above roadside backfill area (IRRBA) in GER was established,the stress distribution expression of IRRBA in GER was deduced,and the stress distribution evolution of IRRBA in GER was researched based on the space-time movement characteristics of IRRBA in GER.Then,the tensile stress depth and horizontal dislocation region calculation formulas of IRRBA in GER,and the corresponding evolution laws were obtained.Results show that the stress state of IRRBA in GER are associated with the main roof rotation angle and the immediate roof damage variable,and that the tensile stress depth decreases and the horizontal dislocation region increases with the increase of main roof rotation angle.Combined with the 3107 longwall engineering geological conditions of Xinyuan Colliery,the dynamic regional consolidation control countermeasures for IRRBA in GER were put forward.Field practice shows that the application of control countermeasures has achieved an expected effects for the subsidence of IRRBA and surrounding rock stability control in GER.
Keywords:gob-side entry retainingbckfill areaimmediate roofstress statevariational method
Publication Date:2017-01-01
Pages:11( 1960-1970 )
Journal of China Coal Society

Journal of China Coal Society

PKUISTICEI
ISSN:0253-9993
Year, Vol.(Issue):2017,42(8)