Research and practice on shortwall part filling technology using fly ash high-water material
ZHANG Xin-guo
LIU Wei-tao
SUN Xi-kui
LIU Jin-xiao
LIU Zhao-ping
LI fei
PANG Zhen-zhong
Keywords:mining above confined water and under buildingsshortwall part fillingfilling joint support bodydepth of floor damagesurface subsidence control
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
