Two-step gob-side entry driving technology of pre-build artificial side substitute for narrow coal pillar
ZHANG Dong-sheng
WANG Hong-sheng
MA Li-qiang
Machine-generated Keywords:
Publication Date:2010-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
