Study on overcutting-bolting & grouting-backfilling concrete to control the floor heave of deep mine roadway
XIE Guang-xiang
CHANG Ju-cai
Machine-generated Keywords:
Publication Date:2010-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
