Gas drainage technology for high gassy gateway heading faceYAO Shang-wen, LIU Ze-gong, YANG Li-xin1-4
Rapid holding and control for special large water inrush from sink hole in Dongpang MineLIU Jian-gong, ZHAO Qing-biao, BAI Zhong-sheng, WANG Xi-rui, JIANG Qin-ming4-7
Speed regulating system for electric magnetic speed regulating electric haulage shearer with microcomputerWU Hao, WANG Wei, LI Xiao-bo, LIU Yuan-Fa8-11
Support technology of bolt and anchor truss applied in large chamber of Tangkou MineLIU Yan-sheng, ZHAO Jing-zhong, YANG Jia-en, LIU Ye-xian, LIN Deng-ge12-15
Practice on trial mining in special thick seam with soft roof, soft coal, soft floor, high inclination, rich water and high gass under nappeBAO Zheng-ming15-18
Technnology of joint application gateway for double slicing coal mining face in Tucheng MineTIAN Shuang-liang, PEI Li-ming, GU Guang-xian, RUAN Guo-chu, SUN Chang-jiang19-21,25
Ground behavior and control of coal mining face with weathered soft roofYANG Ben-shui, XUAN Yi-qiong, WANG Yu-quan22-25