Research and Application of Ventilation and Dust Collecting System for Fully Mechanized Gateway Heading Face1-3
Practices on Fully Mechanized High Cutting Coal Mining Technique with Full Seam One Passing Mining Domestic Equipment in Sihe Mine4-6
Research and Application of In-seam Deep Borehole Construction Equipment and Technique in Pingdingshan No.10 Mine7-10,14
Technology and Practices on Mine Strata Pressure Control of Fully Mechanized Longwall Coal Mining Face with Shallow Mining Depth11-14
Analysis on Failure Mechanism of Fiber Reinforced Plastics Bolt Based on Mining Gateway Sidewall Deformation18-20
Practices on Prevention and Control of Rock Bumping in Mine Shaft Bottom Roadway of Pingdingshan No.4 Mine21-23
Research on Rapid Reinforcement Technology for Mine Inclined Shaft Passing Through Dynamic Roof Failing Zone24-26,57
Research on Coal and Gas Outburst Prevention Technology During Mine Rock Roadway Heading with Short Distance to Seam31-34,38