Research on rapid excavation technology for deep mine large cross sectional rock roadwayLI Qing, YANG Ren-shu, TANG Zeng-lu, GUO Ya-jing, ZHANG Dian-zhen, YAO Rui1-4
Application of high level gas drainage gateway to high gassy fully mechanized coal mining faceHE De-jiang5-7,11
Application of ultrasonic flowmeter of water drainage ditch to underground mine water drainage systemSHEN Zhao-zhen, DING Bao-hua, GUAN Lian-jun8-11
Design and application of enterprise's information integration base on .netLIU Ji-min, WANG Xiao-ning, ZHANG Cheng-ming12-14
Roadway layout and construction in mine with potential gas outburstLU Feng-shun, WANG Dian-lu, ZHOU Jin-cheng, ZHAO Zhang19-21
Technology of pre-stressed bolt support for rock floor gateway in deep mine complicated conditionsCHEN Jia-xuan22-24
Discussion on shaft drilling technology of complicated stratum in Juye Mining AreaLIU Zhi-qiang, WANG Cheng-yuan25-27
Technology for sublevel caving working face with light weight hydraulic powered supports passed through mine used roadwayMA Chang-ge28-29,32