Development of drilling parameter monitoring system for directional drilling rig in coal mine
FANG Peng
YAO Ke
WANG Song
ZHAO Liang
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 124-130 )
