Technical analysis on coalbed methane continued drainage system with rod pump and speed tube
GUO Hui
Abstract:In order to solve the mismatching problems of the production equipment with the water production and gas production due to the production condition seriously changed when the gas drainage of the coalbed methane wells were transited from the early period to the late period,based on the analysis on the drainage features of the rod pump and speed tube,a continued well switching gas drainage technical method was provided with the rod pump-speed tube drainage,a feasibility analysis of the technique was completed and the design on the technical process of the overall switching operation was completed.The study showed that the application of the technology could avoid the repair operation of the well.Under the condition of non stop operation,the rod drainage technology could rapidly replace the process of the speed tube drainage technology.Thus,the damage to the reservoir of the coalbed methane well could be reduced,the continued drainage operation of the coalbed methane well could be ensured and the stable production time and trouble-free drainage time of the coalbed methane well could he prolonged.
Keywords:coalbed methanerod pumpspeed tubecontinued drainage
Publication Date:2017-01-01
Pages:6( 59-64 )
Coal Science and Technology

Coal Science and Technology

PKUISTIC
ISSN:0253-2336
Year, Vol.(Issue):2017,45(9)