Study on drilling/cementing technique affected to production control of coalbed methane vertical well
Liu Shiqi
Sang Shuxun
Li Mengxi
Zhu Qipeng
Liu Huihu
Keywords:drillingwell cementingproduction capacitycoalbed methane wellsouth of Qinshui Basin
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
