Application of Connected Long Bolt Support in High Cutting and Narrow Coal Pillar Gateway of Deep Mine
FENG Ji-cheng
MA Nian-jie
CAI Meng
XU Ting-hui
MA Wang
Abstract:In order to solve a deep broken depth of the sidewall along the gateway with high cutting narrow coal pillar in deep mine and a low extension rate of an anchor,a connected long bolt applied to the roof support of the gateway was provided to replace the anchor and a rigid long thread bar connected bolt applied to the gateway sidewall was provided to replace the short bolt support technology.Based on the site measurement and the FLAC3D numerical simulation,a connected long bolt support plan was set up,the bolt support parameters were optimized and a site comparison experiment was conducted.The results showed that there was a high relationship between the anchor sup-port effect and roof subsidence value.Due to the high support strength of the anchor,when the roof subsidence value was not over the exten-sion value of the anchor,many anchors were broken and failure occurred and the connected long bolt with no broken phenomenon occurred had good support function.The rigid long thread bar connected bolt support would well control the convergence value between the two side-walls during the mining and excavation period and could reduce the deformation and stability time of the two sidewalls.
Keywords:high cutting in deep minenarrow coal pillarconnected long boltsurrounding rock stability
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 22-24,37 )
Coal Science and Technology

Coal Science and Technology

PKUISTIC
ISSN:0253-2336
Year, Vol.(Issue):2014,(8)