Study on Gas Drainage Technology of Screen Pipe Putting Down Along Full Length Borehole in Soft Outburst Seam
XIAO LiHui
LI Yanming
GUO KunMing
ZHONG Pei
Abstract:According to the soft seam,low permeability,low borehole completed rate of the gas drainage borehole drilled and other problems of the soft and outburst seam, a technology of screen pipe putting down along full length borehole for gas drainage was developed. The technology was applied to the site experiment in Pingmei No. 10 and Xinji No. 1 Mine.The results showed the screen pipe putting rate for the technology of screen pipe putting down along full length borehole was over 97%. In comparison with the conventional drilling rod withdrawing and open hole technology, the average concentration of gas drainaged from a single borehole in Pingmei No. 10 mine increased by over two times and the average quantity of gas drainaged from a single borehole could increase by 3.5 times.In comparison with the normal drilling rod withdrawing and screen pipe putting down technology, the concentration of gas drainaged in Xinji No. 1 Mine was increased by one time nearly and the expected effect was reached.
Keywords:soft outburst seamgas drainagelarge borehole open and close type drilling bitscreen pipe
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 61-64 )
