Monitoring and Measuring of Mine Pressure Bumping and Prevention and Control Technology in Huating Mine
Abstract:In order effectively prevent and control the mine pressure bumping occurred in Huating Mine, the cause of the mine pressure bumping occurred was systematically analyzed and a mine pressure comprehensive monitoring and measuring and early warning manage-ment system was established mainly with micro seismic method and secondary with the acoustic emission, electromagnetic radiation and drilling cuttings detection. With the optimization of the coal mining face layout, coal pillar width, mining and caving ratio and the coal mining face advancing rate, the coal mining technology condition was improved. With the application of the seam water injection, the deep borehole blasting in the roof and floor, pressure releasing blasting in seam, the large diameter borehole and other measures, the mine pres- sure bumping danger could be actively released. Meanwhile the mine roadway support was enhanced and the personnel protection and other enhanced prevention measures conducted, the time of the mine pressure bumping affected to the mine production was reduced from 36 days to 6 days per year. The mine safety production could be ensured.
Keywords:mine pressure bumpingmicro seismic monitoring and measuringpressure releasing blastingseam water injection
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 20-23,79 )
Coal Science and Technology

Coal Science and Technology

PKUISTIC
ISSN:0253-2336
Year, Vol.(Issue):2012,40(9)