New Backfill Material Applied to High Roof Falling Zone of Ultra Thick Seam Gateway
Abstract:In order to solve the highroof falling zone danger problems of the mining gateway occurred in the fully mechanized top coal ca-ving mining in thick seam, based on the analysis on the cause of the high roof falling zone and danger, a new backfill material of high roof falling zone was developed. In combination with the certain conditions of the high roof falling zone in the gateway, a suitable backfill tech- nique was selected. The site application results showed that the backfill material could have the features of the material with the light weigh and non-combustion, the compressive strength after three days could reach at 1.4 MPa and the swelling rate could be 6% ~ 8%. The borehole sight showed that the backfilled material in the high roof falling zone was compact with no crack and broken and the back- filled material were well bond with the roof of the high roof falling zone. Under the influences of the periodical pressure and mining activi-ties, there were no deformation and bedding occurred in the backfilled material of the high falling zone. The backfill material and the backfill technique could well solve the existed problems of the high roof falling zone.
Keywords:highroof falling zonebackfill materialultra thick seambackfill technique
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 6-8,89 )
Coal Science and Technology

Coal Science and Technology

PKUISTIC
ISSN:0253-2336
Year, Vol.(Issue):2012,40(9)