Study and Application of Gas Drainage Technology to High Level Gateway with Two Utilizations
Abstract:In order to eliminate the coal and gas outburst danger occurred in the mine seam gateway driving period and to solve the gas content over the limit of the coal mining face, a high level gateway was made in the upward of No. 1031 coal mining face of Songhe Mine. Boreholes drilling through strata of the floor in the high level were made for the gas pre-drainage of the driving strip before the driving op- eration. The high level gateway could be applied to drain the upper corner gas in the goaf during the mining operation of the coal mining face. With the high level gateway gas drainage method of the one gateway with two utilizations, there was no coal and gas outburst oc- curred during the gateway driving. During the mining of the coal mining face, the max gas volume fraction in the air retuning flow was not over 0. 8% and the max gas volume fraction in the upper comer was not over 0. 96%.
Keywords:high level gatewaydrainagegasone gateway with two utilizationsthrough strata boreholecrack zone
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 51-54 )
