Application of Grouting Water Sealing Technology to Mine Auxiliary Shaft Sinking in Shicaocun Mine
Abstract:In order to rationally solve the problem of the mine auxiliary shaft sinking passing through an aquifer in Shicaocun Mine and to provide the favorable construction conditions for the mine shaft sinking,the directional drilling and comprehensive grouting technology was applied to the S borehole directional drilling for the surface pre-grouting process before the mine shaft sinking operation.With the rational technical parameters set up,the application of the rational grouting technology,the grouting material and the grouting equipment could make the grouting operation and the mine shaft sinking operation simultaneously.The project practices showed that the total water inrush value from 12 aquifers was reduced from 391 m3/h to 5.7 m3/h.A dry shaft sinking target was reached and the water sealing effect was obvious.
Keywords:mine auxiliary shaftgrouting water sealingdrilling technologyS type borehole directional drilling
Publication Date:2011-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)