Practices on Stability Lost Control of Mine Large Cross Section Crossing Roadway in Watery Soft Rock
Abstract:In order to have the stable control of the mine large cross section crossing roadway in watery soft rock,the paper had a study on a formation and cause of the stability lost in the large cross section crossing roadway heading in watery soft rock of Yushujing Mine.More economic and efficient support structures and rational support parameters were set up.In order to keep the stability of the mine roadway,the complex full closed support means,including the key location reinforced support + full cross section bolts and grouting + U29 type steel support at the arch location,fixed shield and anchor support at the shoulder location + floor lined with reinforced concrete reverse floor arch and others were applied.The practice results showed that the complex support means could effectively control the stability of the mine large cross section crossing roadway in watery soft rock.After 45 days of the roadway repaired,the observation showed that the mine roadway was stable in tendency and the convergence and deformation rate of the roadway was 0.012 mm/d.
Keywords:watery soft rocklarge cross section crossing pointstability lostsupportfull cross sectional bolting and grouting
Publication Date:2011-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Coal Science and Technology

Coal Science and Technology

PKUISTIC
ISSN:0253-2336
Year, Vol.(Issue):2011,39(7)