Construction and Designing of the Plugging Water Inrush of Shaft by Using the Chemical Grouting of Double-Base Fluid倪修全1-2
Economic Analysis of the High Expenditure Plan in the Clean Production of Pangzhuang Colliery罗武贤10-11
On Developing Countermeasures and Existence of the Special Web for Coal in Xuzhou Coal Mining Group Co.燕宪连12-13
Thought of the Development Strategy on the Special Communication Web in Xuzhou Coal Mining Group Co.朱涛14-15
Application of the Temporary Central Line in the Construction of the Prospecting Drift for Kaolin-Sandstone曹立庆, 刘生优24-25