Research on the normal operation of virtual power plants in the field of building air conditioning
CHENG Huanyu
XU Xiangmin
GUO Fengfeng
WANG Yang
Abstract:With the green-oriented transition of energy,the"source following load"operation mode of the traditional power system has been unable to meet the current trend of cleaner power supply,electrification of terminal power consumption and intelligent power grid.The peak and valley gap of power grid demand has gradually expanded,and local tension of power supply at peak times has occurred from time to time.It is urgent to use market-oriented means to tap the load-side adjustment ability,and respond to the real-time balance of generation and electricity economically and flexibly.Based on the research results of the Suzhou virtual power plant pilot project,this paper summarizes the key constraints faced by the current air conditioning resources in Suzhou to participate in the electricity market,and puts forward the development path for the normalized operation of the virtual power plant in the field of building air conditioning in Suzhou,in order to promote the virtual power plant to better adapt to the requirements of the new power system construction,and help the sustainable development goal of the virtual power plant in Suzhou.
Keywords:virtual power plantnormal operationair conditioning loaddevelopment bottleneckpath suggestion
Publication Date:2024-08-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 38-43 )
Coal Economic Research

Coal Economic Research

ISTICAMI
ISSN:1002-9605
Year, Vol.(Issue):2024,44(8)