Design on redundant control system of mine boiler building base on industrial ethernet and site bus可雪杰, 曹中科6-8
Coal preparation method selection and coal preparation technique design for East Surface Coal Preparation Plant李希鹏11-13
Application of deep borehole anchor grouting technology to prevent and control floor heave in mine soft rock chamber缪万里, 李翔, 涂强20-21
Study on optimization of mine shaft construction period for Zhaogu No.1 Mine郭文斌, 吕明凤, 刘海洋, 陆明心, 杨国枢, 张国秀22-24