Study on the rational staggered operation for mining simultaneously the two nearby coal seams马全礼, 耿献文, 童培国11-13
Selection and economic benefit analysis on alternatives of dam water flood prevention project in Ha'erwusu Open Pit MineGUO Zhao-hua13-15
Understanding to Chapter 8.6.3 of "Fire Prevention Code for Architectural Design" and to Chapter 7.4.8 of "Fire Prevention Code for High Civil Architectural Design"陈春喜, 金云霄, 李全营21-22
prevention and control of cracks in structures of coal storage yard,coal preparation plant宋绍飞, 刘戈, 陆清彦28-29