Design and calculations of the hydraulic system of the integrated electrohydraulic cylinder李明, 宋秀索9-11
Experience in modifying the service shaft of Chaili coalmine by adopting light-weight cage吴志弘, 刘晓群, 李良曙, 冯庆全14-16
Construction Technology Straighten-out technology for the deviation of large building and structure caused by underground mining张俊英16-18
Methods for solving the difficult points relating to drilling pile holes by the auger rig in thick and mixed baekfilled ground刘学峰, 杨明武22-23