Implementation path of high quality development in Xingjie Taigemiao mining areaYANG Junzhe, WANG Xudong, XIN Delin, YIN Ning1-6
Key technology and field application of high efficiency dense filling in short wall working faceYANG Kang, GUO Xin, LI Wenxin, LIU Guangzhao, ZHANG Zhe, WANG Jianzhi, HOU Wenhui7-11
Research on reasonable coal pillar width of coal-rock gob-side entry driving in inclined coal seamLIU Pengze, GAO Lin, XU Shuai, ZHAO Shihao, ZHAN Xinyu, SHEN Yexing12-18
Design and application of tunnel engineering based on Revit secondary developmentLI Gang, WANG Xiaodong, REN Fuqiang, ZHANG Zhiwei, SHANG Yuqi19-23
Calculation method for reactive compensation capacity of PV power stationQI Yanan, LIU Baoguo, WEI Daining, YANG Wenxiao24-28
Application of long-span steel bellows in open-pit coal mine overpass project under heavy load conditionKANG Xiaokong29-33
Evaluation method of heavy haul coal transportation highway line selection considering traffic safetyLI Jianjiang, YIN Danni, YANG Yanqun34-37
Surrounding rock control technology of soft-floor gob-side entry retaining in fully mechanized caving faceSONG Xubin38-44
Evolution of deviatoric stress and control of surrounding rock at gob-side entry retaining filled with narrow high-water materialYAN Deheng45-51
Water jet technology for rock burst prevention in roadway under dynamic pressure in syncline zoneLIU Chang52-56