Discussion on Preparation and Execution Importance and Problems of Engineering Construction Code and StandardLIU Yi1-3
Analysis on Feasibility of Upward Mining in Ultra Thick Seam of Longwanggou MinePANG Yi-hui, LIU Jun-feng, YUAN Ren-yuan8-10,13
Application of Floor Grouting Reinforcement Technology to Extension Section of Mine Auxiliary Inclined Shaft Passing Through AquiferWANG Fei, LI Guan-jun37-39
Construction Technology of Mine Surface Ground Material Feeding Borehole and ApplicationLIU Yong-fang, MENG Jian-yong, SHI Yong, JIANG Hai-feng, CHI Peng40-42
Analysis on Mine Strata Pressure Law of High Cutting Coal Miming Face in Shallow Depth Seam Under Thin Base Rock and Suitability of Powered SupportLIU Jiang43-45,48
Study on Mine Strata Pressure Law of High Cutting Fully Mechanized Coal Mining Face in Shallow Depth SeamZENG Tai46-48
Study on Gas Emission Law and Gas Drainage Plan of Protective Seam with Close Distance to Other seams in Multi SeamsTIAN Shi-xiang, JIANG Cheng-lin51-54
Slime Pipeline Transportation and Large Proportion Slime Co-Fired Technology of CFB Boiler in Power Generation PlantLIU Zhi-qiang55-57
Study on Surrounding Rock Improvement Principle and Control Technology of Seam Gateway with High Pre-Tensioned SupportXUE Guang-zhe, BAI Jian-biao, WANG Xiang-yu, YU Yang, LI Chao58-61