Goaf water bin filling design and surrounding rock control technology in gob-side entry driving with narrow coal pillarFU Zhong-hua, WU Yu, ZHANG Yan, LIN Ji-kai, HAO Yang1-7
Width to height ratio effect and size optimization of coal pillar in fully-mechanized caving mining faceCHEN Bing, GAO Liang, DU Zheng-hu8-12
Design of gangue reentry for backfilling mining in fully mechanized mining face of medium-thick seamGAO Feng13-16
System design of intelligent fully mechanized working face in thin coal seam of Sihe Coal MineSUN Jin-lu, GAO Gui-jun, JU Lin-tao, SHI San-bo17-21
Research and application of pumping pillar support for large section abandoned roadways in Shendong mine areaYANG Jun-cai31-37
Grouting reinforcement for advance pre-excavated roadway of working face to cross fault groupWANG Fu-hai, YANG Yong-gang, YANG Zhang-jie, CHEN Kang, WANG Qing-niu38-42
Main controlling factors of surrounding rock stability structure for gob-side entry driving in thick coal seamZHANG Jing-min, MENG Fan-lin43-48
Surrounding rock failure law and control of gob-side entry driving in fully mechanized top coal caving faceGAO Jing-ang49-56