Study on stagger position roadway layout to prevent rock burstWANG Peng, LI Chun-ge, YANG Chang-de, WANG Zhi-qiang8-10
Study on surface mine capacity with casting blast-dragline stripping technologyMA Li, LI Ke-min, CHANG Zhi-guo, XIAO Shuang-shuang, DING Xiao-hua, TANG Wen-liang11-14
Optimized design on big drop chute under head funnel of belt conveyorLI Jun-feng, CUI Zhao-xia, QI Xiang-dong, ZHOU Ning, YANG Tao15-17,21
Calculation analysis on transverse stiffness of guide wire rope for mine hoistJIAN Qiang, XUE Yu-jun, LI Ji-shun, ZOU Sheng-yong, DING Kai18-21
Application of pipe belt conveyor in ground conveying system of Anyang Coal MineLI Xiang-hui, LI Hao-yuan, RUAN De-lin22-24
Technical transformation of dewatering system for flotation concentrate in Fangezhuang Coal Preparation PlantJIANG Bin-bin, YANG Lei, WEI Ru-hui25-27