Optimization of gas extraction parameters in roof directional long drilling of Licun Coal Mine
SHEN Haisheng
ZOU Hu
LIU Lei
ZHAO Chunzhou
WANG Yanmin
CAO Liangwei
TIAN Jinxiu
TIAN Long
Abstract:Aiming at the problems of large engineering quantity,high cost and influencing mining-tunneling alternation in high gas extraction lane,the reasonable layout range,drainage mechanism and key influencing factors of directional long borehole in roof were analyzed.According to orthogonal experiment and variance analysis,the sensitivity index of extraction effect was determined.In the 1305 working face of Licun Coal Mine,the test was carried using roof directional long drilling instead of high gas extraction lane,and the test results show that the roof directional long drilling achieved the effect of gas extraction in high gas extraction lane,and the gas concentration in the upper corner was controlled within the safe range.The construction progress was fast and the cost was low,which solved the tense situation of mining-tunneling alternation.
Keywords:long directional drilling of roofhigh gas extraction lanegoafextraction parameters optimization
Publication Date:2024-01-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 98-104 )
Coal Engineering

Coal Engineering

ISTICPKU
ISSN:1671-0959
Year, Vol.(Issue):2024,56(1)