DOI: 10.11799/ce202312007
Coordinated mining planning of multi-face mining in contiguous coal seams
ZHANG Haochun
Abstract:Aiming at the the problem of coordinated mining of multiple working faces in shallow coal seams for balanced production benefits faced by many mines in Western China,which is mainly limited by the complex time-space conflict relationship and the complex characteristics of mine pressure.Based on the engineering background of Shaping Coal Mine in Hequ,Shanxi Province,the timing and spatial layout of multi-coal seam mining in the established No.2 panel area are analyzed and optimized by means of theoretical analysis and numerical simulation,to guide the layout and continuation of the working face in the panel.The numerical simulation analysis of panel scale realizes the quantitative analysis of mining response of different mining schemes,and the overburden structure of repeated mining determines the influence angle of lateral mining.The 13104 working face of Shaping Coal Mine needs to be continued after the mining of 9201 and 9202 working faces,which has no obvious effect on 10201.In order to ensure the sequential replacement of fully mechanized caving face during coordinated mining,it is necessary to adopt the technology of gob-side entry driving with roof cutting and pressure relief.
Keywords:coal seams groupcoordinate miningpanel scaleresidual coal pillargob-side entry retaining
Publication Date:2023-12-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 34-38 )
