DOI: 10.11799/ce202311003
Integrated mining design of coal mining separating and filling for gangue non-lifting in Yiqiao Coal Mine
LIU Haiquan
WANG Zhongliang
WEI Xiaofeng
PENG Leixiang
Keywords:coal under constructionsgangue non-liftingintelligent dry separationcontinuous mining and filling
Publication Date:2023-11-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 12-16 )
