DOI: 10.11799/ce202309010
Study on roof stability and control of withdrawal channel in fully mechanized mining face in Shendong mining area
GAO Kuiying
LU Heng
FENG Zhizhong
Keywords:withdrawal channelnumerical simulationinterval pillarlong key block
Publication Date:2023-09-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 53-59 )
